Most glass facades in Riyadh use one of four systems: stick, unitised, structural silicone glazing or spider (point-fixed) glass. Each holds the glass differently, is assembled in a different place and suits a different building. Here is how each works and what to ask for.
Published by Alfa Aluminium · · Updated · 10 min read

What a curtain wall is, and what it is not
On Saudi sites, a glass facade hung in front of the structure is called a “curtain wall”. The Centre for Window and Cladding Technology (CWCT) defines curtain walling as a vertical enclosure that carries no load other than its own weight, its ancillary components and environmental forces such as wind. Brackets pass those loads to the slabs; floor loads never pass through it.
The European standard EN 13830 covers curtain walling as a kit, fixings included, from vertical to 15° either side. Such a wall does not contribute to the stability of the main structure and can be replaced independently, so it is designed and tested as one system, not as a row of windows.
Vision areas are the transparent panels. Spandrel areas are the opaque zones in front of slab edges and ceiling voids. A curtain wall runs past the slabs. Windows set between slabs on each floor are a different system, even when the result looks like a glass box.
The four systems at a glance
CWCT Technical Note 14 lists six curtain wall types, with stick and unitised as the two main ones. This guide compares four systems: stick, unitised, structural silicone glazing and spider (point-fixed) glass.
| System | Glass held by | Assembly and installation | Typical use | Check first |
|---|---|---|---|---|
| Stick | Pressure plates and outer caps | Workshop-cut profiles, glazed on site from scaffold | Villas, showrooms, low- and mid-rise offices | Site sealing and workmanship |
| Unitised | Caps or structural silicone, glazed into the panel frame in a factory | Lifted by crane or hoist, hung floor by floor | Towers and repetitive offices | Stack joints and lifting plan |
| Structural silicone glazing (SSG) | Silicone bond to an aluminium adapter frame | Usually bonded in a factory (four-sided bonding always), then fixed to a stick or unitised frame | Flush-glass offices and showrooms | Joint calculation and adhesion tests |
| Spider / point-fixed | Stainless fittings through drilled holes | Steel, glass fins or cables built on site | Double-height entrances, lobbies, canopies | Structural glass design |
Stick system: built piece by piece on site
A stick wall is assembled on the building in sequence. Full-height mullions go first, joined through the building height with expansion joints. Transoms follow, then the glass, then the pressure plates and outer caps that clamp the glass and form the visible lines.
Profiles are cut in the workshop, but most of the work, including glazing, happens on site. A 50 mm face width is the most common, and slimline systems of about 35 mm exist. Installation needs scaffolding or full access on both sides, longer site time and more joints sealed in the open, so workmanship matters.
- Strengths: adapts to site tolerances and late changes, and needs no crane for large panels.
- Best fit in Riyadh: villas, podiums, showrooms and low- to mid-rise offices. Our curtain wall service covers design, fabrication and installation, with the system selected per project.
Unitised system: factory panels hung floor by floor
A unitised wall uses storey-height panels framed and glazed in a factory; in North America they are typically about 1500 mm wide. Each panel is lifted by crane or mobile hoist, without scaffolding, hung on slab-edge brackets and interlocked with its neighbour. The horizontal joint to the panel below is called the stack joint.
Factory glazing means fewer site-sealed joints and fewer people on site. Panels go up one floor at a time, so the building closes in earlier and interior work can start sooner.
- Cost and logistics: higher direct costs, workshop space, protected transport and site lifting equipment.
- Design time: panel design, testing and production must be planned early.
- Best fit: towers and repetitive multi-storey offices. It is rarely economical for a single villa.
Unitised is not automatically faster or cheaper; the saving comes on tall, repetitive elevations. For large commercial envelopes, see large-scale aluminium facades.
Structural silicone glazing: glass bonded, not clamped
In SSG the sealant itself holds the glass. ASTM C1401 describes an application where the sealant primarily provides the structural support and attachment of the glass to the framing, for walls within 15° of vertical, and accepts only silicone formulated and tested for SSG. The glass is bonded to an aluminium adapter frame, which is then fixed to the wall.
- Two-sided SSG: two opposite edges are bonded and the other two are capped mechanically, so only vertical or only horizontal lines show.
- Four-sided SSG: all edges are bonded and no frame shows outside. EN 13022 calls for SSG bonding under controlled environmental conditions, and four-sided SSG is normally factory work within unitised construction.
- Dead load: a hidden mechanical support for the weight of the glass is recommended.
- Joint size: in one sealant maker's design guide, the structural bite and the joint thickness are each at least 6 mm, with a bite-to-thickness ratio of 1:1 to 3:1, calculated per project.
Soft Low-E coatings are generally not resistant enough to be bonded, so where necessary the coating is removed along the bond line and adhesion is tested on the prepared glass. The outer seal of an insulated glass unit used in SSG must be silicone.
Spider and point-fixed glass: bolted through the pane
Spider glazing holds each pane with fittings through drilled holes or through the joints between panes, using countersunk bolts, bolts with patch plates or articulated bolts. One maker's spider fittings, for example, are cast 316 marine-grade stainless steel. Steel posts, glass fins or tensioned cables behind the glass carry the loads.
Holes concentrate stress in the glass. ASTM E1300, the usual method for glass load resistance, does not address glass with holes and notches, so an engineer experienced in structural glass must design it for the chosen hardware.
- Glass: vertical panes can be fully tempered (monolithic or insulating) or heat-treated laminated. Overhead and sloped glass, 15° or more from vertical, must be heat-treated laminated.
- Tall walls: the glass may need to hang from above, because stacked panes can buckle.
- Safety: no direct metal-to-glass contact, room for movement, and redundancy to avoid or greatly reduce the risk of progressive collapse if one element fails.
Point-fixed glass suits double-height villa entrances, showroom fronts, lobbies and canopies. See glass facades and storefronts and, for overhead glazing, aluminium skylights.
Riyadh heat, movement, sealants and fire
Aluminium expands about 23.8 × 10⁻⁶ per kelvin and glass about 9 × 10⁻⁶, so for the same temperature change aluminium moves roughly 2.6 times as much. One sealant maker's design guide uses average temperature differences of about 30 to 60 K for the frame and the glass when sizing structural glazing joints. As a rough example, a 3.5 m mullion warming by 50 K grows by about 4 mm, and every joint and bracket must allow that movement.
For weatherseal silicones with 25% movement capability, the joint must be at least four times as wide as the expected movement. In Riyadh's heat and dust, drainage paths, gaskets and the junction to concrete matter as much as the glass. Tested systems reduce leakage risk, but seals still need periodic inspection.
Smoke and flame can travel between floors through the gap at each slab edge. Where fire-resistance-rated floors are required, Section 715.4 of the 2015 International Building Code requires that void to be sealed with an approved system tested to ASTM E2307. The 2018 edition of the Saudi Building Code SBC 201 is largely based on the IBC. Your consultant confirms which edition and which requirement apply to your project.
Which type for a villa, office, tower or lobby?
Start from the building type, height and access, the look you want and how a broken pane will be replaced. Then ask each bidder for the items listed after the table.
- System type and drawings, including anchor and stack-joint details and whether the profiles are thermally broken (see thermal-break vs standard aluminium).
- Mock-up or test reports: air (ASTM E283), water (ASTM E331 and AAMA 501.1), structural (ASTM E330) and, where relevant, drift (AAMA 501.4).
- For SSG: the joint calculation, the adhesion and compatibility report and the dead-load support detail.
- Glass make-up per elevation, including whether tempered glass is heat-soak tested. See high-performance glass.
- Perimeter fire barrier detail at every slab edge.
- Pane replacement method and maintenance access.
| Building | Usual choice | Why |
|---|---|---|
| Villa or farm house | Stick, capped or two-sided SSG; spider glass at a double-height entrance | Flexible on site, no panel crane |
| Showroom or low- to mid-rise office | Stick, or stick with SSG | Clean look with site flexibility |
| Tower or repetitive office | Unitised, capped or with four-sided SSG | Less site sealing, factory quality control |
| Lobby, atrium or canopy | Spider on steel, fins or cables | Maximum transparency |
List these items in your enquiry; see how to prepare a project quote. For a completed example, see the Al Muzahmiyah private farm in Riyadh: a curtain wall facade with a tall glazed elevation divided by dark vertical members and horizontal divisions, plus an aluminium skylight and smart aluminium doors, fabricated and installed by Alfa Aluminium.
Planning a glass facade in Riyadh?
Send us your drawings, elevations and project location. The Alfa Aluminium team in Riyadh can review curtain wall options, glass and installation for your villa, office or commercial building, with the system selected for your project.
Every installation carries a 5-year warranty on aluminium installation against water and dust leakage.
Discuss your facadeRelated pages
Sources
- Building.co.uk — CPD 20 2018: Aluminium curtain walling (CWCT definition, stick and unitised installation)
- Building.co.uk — CPD 20 2017: Specifying aluminium curtain walling (CWCT TN14 types, face widths, installation methods)
- Canadian Architect — Mark Brook, Curtain Call for Curtain Wall (2005): unitised module and four-sided structural glazing
- Intertek — EN 13830: Curtain walling product standard (scope)
- ASTM C1401-23 — Standard Guide for Structural Sealant Glazing (scope)
- SIS — SS-EN 13022-1:2014 Glass in building, Structural sealant glazing, Part 1 (scope)
- Sika — Facade Systems: Sealing and Bonding in Facades, Specification Guide (2011)
- National Glass Association — Glass Technical Paper FB07-05: Point Supported Glazing (2019)
- Opus Hardware (EBOSS library) — Frameless spider facade and canopy systems (cast 316 stainless fittings)
- Windows Facades Magazine — GCC codes and facade fire methodologies (SBC 201 and SBC 801, 2022)
- Windows Facades Magazine — Importance of perimeter fire barriers in curtain wall construction (IBC 715.4, ASTM E2307, 2022)
- UL Solutions — Building envelope performance mock-up and facade testing